Core Lends Power to Eastern Massachusetts

 

Walnut Hill Water Treatment plant treats over 270 million gallons of water each day providing water for 41 communities in Eastern Massachusetts. Ensuring the uninterrupted service of this plant is one the Massachusetts Water Resources Authority’s (MWRA) highest priorities. To accomplish this MWRA called on Core Engineered Solutions to provide a state-of-the-art emergency power system.

Core Engineered Solutions provided an integrated system which included (4) 10,000 gallon above ground fuel tanks, pumps, controls, monitoring systems, tank manifold controls and tank level controls. All systems were built with the best possible equipment including ConVault UL:2085 rated fuel tanks to assure uninterrupted service. ConVault’s seamless six-inch concrete vault design offers maximum protection against natural disasters and vehicle or projectile impact by providing protection for the both primary and secondary containment. Core’s scope of services included design, production, start-up and training.

To discuss your emergency power fueling applications with a Core specialist or to learn more about Core’s capabilities, contact us at P: 800-628-5502, F: 703-563-0330 or E: info@core-es.com

 

 

Request A Quote »