|
Welcome to Vol. 6 of the Core
Tech Bulletin |
|||||||||||
|
Current News and Information from Core Engineered Solutions |
|||||||||||
|
In This Issue
About This Newsletter Welcome to our email newsletter Core Tech Bulletin. Our purpose is to provide you with newsworthy information to keep you up-to-date on regulatory codes, operating issues, interesting system solutions and new technologies. Web links allow you to explore topics in greater detail. Drop me a line and let me know how we're doing. Frank
Evans, President |
With winter approaching and the recent disasters such as the Blackout of "03" and Hurricane Isabel still fresh in our minds, now is the perfect time to review your Fuel Storage System safety and maintenance procedures. Ensuring uninterrupted power and safe dispensing systems begins with preventative maintenance. Regular inspections are required by warranty and by many state/local codes. Preventative maintenance tips include: |
||||||||||
|
|
|||||||||||
|
A major distribution company in NC required a hazardous waste storage building and containment pans. The catch was the building needed to be delivered in less than 4 days. |
|||||||||||
|
Core Engineered Solution's PRO-TEC Chemical Storage Buildings recently passed the FM Global Plant Audit for Flammable and Combustible Liquid Storage Buildings. With this successful completion, Core is now able to provide a TOTALLY COMPLIANT FM Approved solution for the storage of hazardous materials / chemicals. |
|||||||||||
|
|
|||||||||||