Contact Us

Core Engineered Solutions

%name%,  Welcome to Vol. 8 of the Core Tech Bulletin

Current News and Information from Core Engineered Solutions

In This Issue

Operation / Maintenance
-EPA Clarifications

Code / Compliance
-SPCC Update

Featured Solution
-BWI

Featured Technology
-Pre-Engineered Emergency Power  Systems


About This Newsletter

Welcome to our email newsletter Core Tech Bulletin.  Our purpose is to provide you with newsworthy information to keep you up-to-date on regulatory codes, operating issues, interesting system solutions and new technologies.  Web links allow you to explore topics in greater detail.  Drop me a line and let me know how we're doing.

Frank Evans, President
Feedback...

EPA Clarifications for Shop Fabricated AST Owners

On March 31, 2004 at the EPA addressed several concerns of shop fabricated AST owners including the need for integrity testing on secondary containment and the need for a containment system for Fuel delivery trucks.  See the EPA's clarifications.

SPCC Deadline Extending?

The Environmental Protection Agency (EPA) is now proposing to extend certain compliance dates by 12 months.  Learn the new Dates.

Baltimore Washington Airport Takes Flight with Fueling System Upgrades

Core completes complex turnkey aviation Fuel Farm at Midfield Cargo Complex.  Learn about the project.

Pre-Engineered Emergency Power Systems

Core Engineered Solutions provides Pre-Engineered designs for mission critical fueling systems.  Designs are available for aboveground, underground and multi-tank configurations.  View a Sample Emergency Power System Design.


web:www.coreengineeredsolutions.com
email: info@core-es.com
phone: 800.628.5502