|
Did you know that the
U.S. Environmental Protection Agency may require that you post and
implement a written Spill Prenvention Control & Counter Measures (SPCC) Plan. Failure to comply with these regulations
will subject you to extensive fines from the EPA.
General
SPCC Info
•
Must be kept onsite.
• Be certified by a Registered (PE) Professional Engineer.
• Have full management approval.
• Conform with all SPCC requirements in 40 CFR part 112.
• Discuss spill history.
• Discuss spill prediction (i.e., direction of flow).
• Be reviewed every five years by management.
• Be amended when you change the facility and recertified by a
PE.
• Include a spill kit onsite.
Detailed SPCC
Info
• An SPCC Plan
is required when the property has any number of smaller
aboveground tanks totaling 1320+ gallons capacity.
Ref:
40CFR112.1(d)(2)(ii) * 55 gallon drums do count
towards total
• The federal
EPA requires some tank owners to post and implement a written
Spill Prevention Control and Countermeasure Plan (an SPCC Plan).
Ref. 40FR112.3(a).
• The purpose
of SPCC Plans is to minimize the potential for costly oil and
gasoline discharges to the environment.
Ref:
40CFR112.3(a).
• Each SPCC
Plan needs to be written in the specific sequence outlined in
40CFR112.7
(first paragraph).
• Since before
1985, SPCC Plans have been required by the EPA within six months
after newly-installed petroleum storage tanks become
operational.
Ref: 40CFR112.3(b)
• A registered
Professional Engineer, familiar with the requirements of
40CFR112, must examine the tank installations, review the SPCC
Plans, and certify with his PE stamp and signature that the SPCC
Plans have been pre pared in accordance with good engineering
practice.
Ref: 40CFR112.3(d).
• SPCC Plans
must be updated upon each addition or modification affecting
petroleum storage tanks (at least every 5 yrs) and amended as
required...and certified by a PE.Ref:
40CFR112.5(a)+(b).
for
detailed info on SPCC compliance:
www.epa.gov/oilspill
COMPLIANCE
ALERT: The EPA has been actively enforcing the Clean Water
Act. Recent fines have exceeded $600,000. Core
Engineered Solutions has over 10 years experience in fuel
storage / environmental regulations. We can prepare a custom
SPCC plan for you. More about recent violations/fines.
FAQ's
About SPCC Plans
Request
A Quote

|